Chennai Power Shutdown Today on 20-01-2024
Power supply will be suspended in PORUR, AMBATTUR, AVADI areas as mentioned below the following areas on 20.01.2024 from 09.00 am to 02.00 pm for maintenance work.
Supply will be resumed before 02.00 P.M, if the works are completed.
PORUR: KOVOOR Periyapanicheri, Chikkarayapuram, Thandalam, Manancheri, Babu Garden, Akash Nagar, Kumaran Nagar, Metha Nagar and Kundrathur.
AMBATTUR: THIRUVERKADU Kendhra Vihar, Industrial Magna Estate, Noombal, P.H. Road, Pallavan Nagar, M.G.R. Nagar, Perumal Agaram and Vada Noombal.
AVADI: THIRUMULLAIVOYAL Siva Sankarapuram, Jag Nagar, Thendral Nagar, Pathmavathi Nagar and Moorthy Nagar.