Chennai Power Shutdown on 14-07-2021
Power supply will be suspended in the following areas on 14.07.2021 from 09.00 am to 05.00 pm for maintenance work.
Supply will be resumed before 05.00 P.M if the works are completed.
MADURAVOYAL AREA : P.H road part, Karthikeyan nagar, Pallavan nagar, Mettukuppam main road, Vel nagar, Ganesh nagar, Srilaksmi nagar, Kanniyamman nagar, Ayyapa nagar part and surrounding areas.