Chennai power shutdown areas on 19-01-2024
Power supply will be suspended in ADYAR area as mentioned below the following areas on 19.01.2024 from 09.00 am to 02.00 pm for maintenance work.
Supply will be resumed before 02.00 P.M, if the works are completed.
ADYAR: THIRUVANMIYUR Indira Nagar, Periyar Nagar, East & West Kamaraj Nagar, L.B. Road, Thiruvalluvar Salai, Sastrinagar, Avvai Nagar, Rajaji Nagar, Nethaji Nagar, Kannappa Nagar, A.G.S. Colony, Swaminathan Nagar, A.I.B.E.A. Nagar, Kalathumettu area, P.T.C Colony, Venkatesapuram, Sriram avenue, Natesan Colony, Vivekanandar street, Selvaraj avenue, E.C.R., O.M.R.(Kandhanchavadi) and Dr. V.S.I Estate.
PONNERI: SIPCOT I,II&IV HT Consumers, Brila Carbon Limited, OPG power Generation, New Gummidipundi, Gangan Thotti, Papan Kuppam, Sindhalakuppam, Siddharaja kandigai, Pethikuppam, Elavoor, KailurMedu, Periya Obulapuram, Sunnambukulam, Edoor, Kondamanalur, Arambakkam, Naidukuppam, Egumadurai and above all surrounding areas.