Chennai power shutdown areas on 05-01-2024
Power supply will be suspended in GUMMIDIPOONDI area as mentioned below the following areas on 05.01.2024 from 09.00 am to 02.00 pm for maintenance work.
Supply will be resumed before 02.00 P.M, if the works are completed.
GUMMIDIPOONDI: Part of Sidco Gummidipoondi Industrial complex (sipcot SS-III), New Gummidipoondi, Sirupuzalpettai, Pathapalayam, Billakuppam and Iyyerkandigai.