Chennai Power Cut Today On 04-08-2023
Power supply will be suspended in ADYAR, GUINDY, K.K.NAGAR, AMBATTUR, AVADI, PONNERI areas as mentioned below the following area on 04.08.2023 from 09.00 am to 02.00 pm for maintenance work.
Supply will be resumed before 02.00 P.M, if the works are completed.
ADYAR: ENJAMBAKKAM main road & kuppam Cholamandal Art Village, Harichandra Road, VGP layout, V.O.C. Street, Ambethkar Street, Bethal nagar north and south, Ponniamman kovil street. GUINDY: NANGANALLUR Madipakkam Ram nagar 13 to 18th street, Guberan nagar 1 to 13th street, Lakshmi nagar main road 1 to 8th Street, Chigamani nagar 3rd street, Periyar nagar 6 to 8th street , Govindhaswamy nagar 8 to 11th street, Aalaiyamman nagar 1st and 2nd street, Kanchi kaamachi nagar 1 to 3rd street.
K.K.NAGAR: ARUMBAKKAM N.M.Road, Canal bank road, West and East Namachivayapuram.
AMBATTUR: AYAPPAKKAM Plot No. 1 to 4500 T.N.H.B, Thanakala Camp Road ADAYALAMPATTU Aiswarya nagar, Sadayappa vallal Street, Bharathiyar Street, Perumal Koil Street.
AVADI : Thiruvalluvar street, Thirumalai nagar, Ettiyamman nagar, Kalaigar nagar, Koilpathagai main road and above all surrounding areas.
PONNERI: SIPCOT-IV Gummidipoondi Industrial complex, Taluk office, Kanishksteels, Arunsmelters, Pethikuppam, Kayilar medu, Arambakkam and above all surrounding areas.