Chennai Power Cut areas on 09-11-2022

Power supply will be suspended in TAMBARAM, GUINDY, ADYAR, IT CORRIDOR, K.K.NAGAR areas as mentioned below the following areas on 09.11.2022 from 09.00 am to 02.00 pm for maintenance work.

Supply will be resumed before 02.00 P.M, if the works are completed.

TAMBARAM AREA: RAJAKILPAKKAM Chitlapakkam Main road, Mehta nagar, Kalyanasundaram Street, Sri ram nagar, A Part of Sembakkam Area, Annai Theresa street, Krishna Nagar and above all surrounding areas. 

GUINDY AREA: MADIPAKKAM MOOVARASAMPET Dr.Ramamoorthy Nagar, Vishal Nagar extension, Pari colony, Thiruparankundram Street and above all surrounding areas. 

ADYAR AREA: ENJAMBAKKAM ECR, Nainar Kuppam, Akkarai, Kalainger Karunanithi Salai, Bethel Nagar, Kasthuri bai Nagar, Chinnandi Kuppam, Vettuvankeni, Neelangarai, Blue Beach Road, Teachers Colony, Bismilla Nagar and above all surrounding areas. 

IT CORRIDOR AREA: ETL PALLIKARANAI Pillaiyar Koil Street, Gangai amman koil street, Ellai amman koil Street, Part of Ring Road, MCN Nagar Extension, Part of OMR and above all surrounding areas. 

K.K.NAGAR AREA: VALASARAVAKKAM Kamatchi Nagar, Thirupathy Nagar, Kadambadi Amman Nagar, Arcot Road part, Bhuvaneswari Nagar and above all surrounding areas.