Chennai Power Shutdown on 30-04-2019

Power supply will be suspended in the following areas on 30.04.2019 from 09.00 am to 04.00 pm for maintenance work.

Supply will be resumed before 04.00 P.M if the works are completed.

CHINMAYA AREA : West Natesan Nagar, Part of Natesan Nagar, Part of Kaliamman koil street, Elango Nagar, Erikkarai street, Pachaiamman koil street, L&T Colony, Tharachandh Nagar, Part of Venkatesa Nagar, Shek Abdulla Nagar, Saathek Bhasha Nagar, Indra Nagar, Periyar Nagar, Gandhi Nagar, Part of Mettu Kuppam- Lakshmi Nagar, Part of Virugambakkam, Chinmaya Nagar, Part of Alwarthirunagar, Part of Saligramam.

NOLAMBUR AREA: NNS, HIG, MIG, Chinna Nolambur, Adayalampet, kongu Nagar, Mugappair West Block 1 to 8th Block, Raja Garden, Panneer Nagar, Mohanaram Nagar, Jaswanth Nagar, Reddy Palayam area AIBEA Nagar, Vellalar Street, Eri Scheme, Gangai Amman Nagar, Ponniamman Nagar, Keel ayanambakkam.