Chennai Power Shutdown on 29-04-2023

Power supply will be suspended in TAMBARAM, GUINDY, VYASARPADI areas as mentioned below the following area on 29.04.2023 from 09.00 am to 02.00 pm for maintenance work.

Supply will be resumed before 02.00 P.M, if the works are completed.

TAMBARAM: KADAPPERI Chitlapakkam 1st main road, Ramachandra Road, Padmanaba Street, Kannadasan Street, Srinivasa Nagar, MIT and above all surrounding areas.   

GUINDY: RAMAPURAM IPC Colony, Manapakkam, Kolappakkam, Poothappedu, Nesapakkam, MGR Nagar area, KK Ponnurangam Salai (Valasaravakkam) NANGANALLUR B.V.Nagar (10th to 19th Street), Nehru colony, NGO Colony, MOOVARASANPET MMTC Colony Main Road, Subramanian Nagar, Sabapathi nagar PALLIKARANAI Madipakkam, LIC Nagar Full, Sri Nagar TG NAGAR Puzuthivakkam, Ponniamman Koil Street, Puzhuthivakkam Panchath Board Office, 25,26,27,28 Thillai Ganga Street, 2nd main road Nanganallur VANUVAMPET Andal nagar 1st Main road, Nethji Colony, Andal nagar ALANDUR ADAMBAKKAM Erikkarai Street, Parthasarathy Nagar 1st to 11th Street and above all surrounding areas.   

VYASARPADI: MATHUR Manjambakkam All Street, Assissi Nagar All Street, Chettimedu, Srinivasa modern town, sMMDA full part, Chinnasamy Nagar, Kamarajar Salai and above all surrounding areas.   

Share this:

Exit mobile version