Chennai Power Shutdown on 28-08-2020

Power supply will be suspended in the following areas on 28.08.2020 from 09.00 am to 02.00 pm for maintenance work.

Supply will be resumed before 02.00 P.M if the works are completed.

VELACHERY WEST AREA : VGP Selva nagar, Bhuvaneswari nagar, Annai indra nagar, Nathan Subramanian colony, MRTS, Muthukrishannan st.

THARAMANI AND CHINNAMALAI AREA: Kotturpuram slum board, Ranjith road, Suriya nagar, Gandhimandapam road,  Maruthai avenue, Ambadi road, Arunachalam road, Valliyammai Achi road.

KOTTIVAKKAM AREA: 1st to 7th main road Thiruvalluvar nagar, 1 to 55 street Thiruvalluvar nagar, Balakrishna road, Mahaveer Bhagath salai.

MYLAPORE MANDAVELI  AREA: R.K Mutt part, North, South, East mada st, Kesvaperumal west ward, Mangoli East Tank st, Kumaraguru st, Pitchu pillai st, Ponnambala vaithyar st, Palathope, Lala thottam, Chitrakulam, North, South & North Arisikaran st.

MYLAPORE THOUSAND LIGHT AREA: Part of Model School Road,  Part of Azizmulk 2nd st, Murugesan Naicken complex, Greams road.