25.07.18

Chennai Power Shutdown On 25.07.2018

Chennai Power Shutdown On 25.07.2018.Power supply will be suspended in the following areas on 25.07.2018 from 09.00 am to 04.00 pm for maintenance work.

Supply will be resumed before 04.00 P.M if the works are completed.

PORUR AREA : Santhosh Nagar, Subbaiyah Nagar, Krishna Nagar, Lalitha Nagar, Thirumoortthy Nagar, Rajeswari Nagar, Mahalakshmi Nagar, Madha Nagar, Bangala thoppu, Mugalivakkam Main road, M.R.K. Nagar, V.N.D. Avenue and Maxworth Nagar.

THIRUVERKADU AREA : Part of Thiruverkadu, Thiruverkadu Co-Op Nagar, Theroodum Veethi Sivan Koil road, Sundaracholapuram, Kasturi Bai Nagar, Aravind nagar, Kamadenu nagar, Pallikupam, Mathiravedu, P.H. Road, Kaveri Nagar, Ishwarya Garden, Jayalakshmi Nagar, Royal Garden, Mac Nagar, Lourdupuram, Puliambedu road, VGN Mahalakshmi Nagar, Rajankuppam and Ponniaman Nagar.

VYSARPADI AREA : South telephone colony, North Telephone colony, Padmavathi Nagar, Majesticavenue, venunagar, perumalkoil 1st Street, Mandavaeli, Venkateshvara Nagar, Telugu colony, AVM Nagar, Vasantham avenue, ramana avenue, Ganesh nagar and Ramachandar Nagar.

SEMBIUM AREA : Padmavathi Nagaar, Lakshmi Kanthammal Nagar, Sri Lakshiamman Nagar, RC Flats, Thirumal Nagar, Vijayalakshmi Nagar, Surapet Main Road, Thirumal Nagar, Velmurugan Nagar, Grace Nagar, and Kamaraj Nagar Extn.