Chennai Power Shutdown on 22-02-2019

Power supply will be suspended in the following areas on 22.02.2019 from 09.00 am to 05.00 pm for maintenance work.
Supply will be resumed before 05.00 P.M if the works are completed.

THARAMANI / CHINNAMALAI AREA: Nehru street part, Pillayarkoil street part, Thiruvalluvar st, Kalikundram Pillayarkoil st, Periyar st, Anna st, Kanagam.

VELACHERY EAST AREA : Part of 100 feet Taramani link road, Mahathma Gandhi nagar, Thamirabharani st, Jayanth st, Rani st, Ravi st, Kokilam st, Kattabomman st, Shanthi st, Seethapathy Nagar, Anna nagar, New colony.

AMBATTUR AREA: Alliance projects, Annai nagar, Vagai nagar, Sivagami nagar, TVS nagar, Kandigai, Lakeview garden, Perumal koil st, Palla st, Vatcala nagar, Mettu st, Kaviya nagar, Sardha nagar, Ellaiamman nagar, Gopalakrishna nagar, NAS garden, Sivalingapuram , Sakthi nagar, Siyathamman nagar, Puthagaram Senthil nagar.