Chennai Power Shutdown on 20-04-2021

Power supply will be suspended in the following areas on 19.04.2021 from 09.00 am to 05.00 pm for maintenance work.

Supply will be resumed before 05.00 P.M if the works are completed.

AVADI PADIYANALLUR AREA:  P.T moorthy nagar, Padiyanallur, Attanthangal Balamurugan nagar, Attanthangal Entire area, Solaiyamman nagar, Gandhi nagar.

AVADI AREA : CTH road, Gandhi nagar, Kavarapalayam, Sindhu nagar, DRR nagar and Periyar street.

SEMBIUM AREA: T.H Road, Teacher’s colonly, Raja st, Kamaraj salai, Kattabomman main road, Jawahar st, E.B road, Indira nagar west, Ambedkar nagar, Thapal petti, Gandhi st, Perambur high road, S.S.V koil st and above nearby areas. 

TAMBARAM AREA : Nehru nagar, Mambakkam main road, Babu nagar, Palm garden and above nearby areas.

PUZHAL AREA:  Gandhi st, VOC st, Gurushanthi nagar, Thiruneelaganda nagar and above nearby areas.

Share this:

Exit mobile version