Chennai Power Shutdown on 19-09-2020

Power supply will be suspended in the following areas on 19.09.2020 from 09.00 am to 02.00 pm for maintenance work.

Supply will be resumed before 02.00 P.M if the works are completed.

ADYAR AREA: Jeevarathnam nagar main road, 3rd street Parameshwari nagar, Padmanaba nagar (5th st, 4th st), Besant Avenue, Bridge road adyar, LB road, Adyar signal to Brigde road. 

BESENT NAGAR AREA :  1st main road, Besant nagar, Beach home avenue (main road, 3rd street), Dhamodharpuram (main road, New st), Fish Market, 1st Avenue Besant nagar. 

ENJAMBAKKAM AREA : Bharathi avenue, ECR Enjambakkam, Teachers colony, Neelankarai kuppam, Kakkan street, Panaiyur kuppam, TVS avenue, ECR, Allikulam, Easwari nagar, Anna enclave, Uthandi, Pandian nagar, Raja nagar and Pombukar st.  

KOLATHUR AREA: Jayaram nagar, Venkateswara nagar, Thenpalani nagar, Ambedkar nagar, Kambar nagar, G.K.M colonly 31st  to 42nd  st, Poombuhar nagar, KC Garden 1st to 6th st, Venus nagar, Kadappa road, Lakshimipuram, villivakkam road, Vetri nagar, Gopalapuram, Ram moorthy colony, Ram nagar, Sai nagar, Kumaran nagar, Avvai nagar, Teachers colonly, Ganapathy nagar, Adhilakshimi nagar, Bhavani nagar.   

THIRUMUDIVAKKAM AREA : Part of Kundrathur, Thirumudivakkam, Naduveerapattu, Varadharajapuram, Periyar nagar, Kundrathur bazzar, Melathur. 

THIRUVANMIYUR AREA : PTC colony, AGS colony and surrounding areas.