Chennai Power Shutdown On 18.09.2018

Chennai Power Shutdown On 18.09.2018

Chennai Power Shutdown On 18 .09.2018.  Power supply will be suspended in the following areas on 18.09.2018 from 09.00 am to 04.00 pm for maintenance work.

Supply will be resumed before 04.00 P.M if the works are completed.

PONNERI AREA : Arasur, Periyakavanam, Vellodai, Devadanam, Eliambedu, Annuppambattu, A.R. Palayam, Aladu, Perumbedu, Venbakkkam, T.V. Puram, Ponneri, Kodur.

HASTHINAPURAM AREA : Hasthinapuram main road, Alsa garden, Santhakrishnan st, Ramamoorthy st, Kakilanchavadi, GST service road (east side), MIT Bridge, SBI colony, Purushotham nagar, Kumrakundram, Valliammal st, Anjaneyar koil st.

RAMAPURAM AREA : Bharathi salai, Valluvar salai, Sathya nagar, Sabari nagar, Mugalivakkam, Manapakkam, Ramapuram, Poonamalle, Nesapakkam, Jayabalaji nagar, Venkataraman salai, Soolai Pallam (MGR Nagar),Venkateswara nagar, Kolapakkam.

PERUNGUDI AREA : Ezhil nagar, Balaji nagar, Pillaiyar koil st, East OM road, Mettukuppam, VPG avenue and Extension, Ambal avenue, Royal avenue, Kamaraj st, Indira Gandhi st, Pamban nagar, Secretariat colony, Kumaran kudil, Sakthi sreenivasan salai, Devaraj avenue, Parthasarathy nagar, New st, Annai parvathy nagar, part of Neelanakarai area.

NOLAMBUR AREA: NNS, HIG, MIG, Chinna Nolambur, Adayalampet, kongu Nagar, Mugappair West Block 1 to 8th Block, Rajankuppam, Panneer Nagar, Mohanaram Nagar, Jaswanth Nagar, Reddy Palayam area AIBEA Nagar, Vellar Street, Eri Scheme, Gangai Amman Nagar, Ponniamman Nagar, Keel ayanambakkam.

THIRUNEERMALAI AREA: Subraya nagar, Sarswathipuram, Jain complex, Mahalakshmi, Thiruneermalai.

THIRUVANMIYUR AREA : part of L.B.road, 4th West st Kamaraj nagar to 12th West st Kamaraj nagar, Canal road, Ranganthna puram, Judges avenue, Pathyway, Rathinam nagar, Mangaleri one part, ECR part Appasamy appt., Rajaji nagar 1st st, Ganesh nagar, Nathan complex and TNHB colony.