Chennai Power Shutdown on 16-12-2020

Power supply will be suspended in the following areas on 16.12.2020 from 09.00 am to 02.00 pm for maintenance work.

Supply will be resumed before 02.00 P.M if the works are completed.

PAMMAL AREA : Lakshmipuram, Nagalkeni, Muthupalaniyappa st, Kulakarai st, Venkatesan st, Sivasankaran nagar, Saraswathipuram, Ennaiyiram st, Neelakandan st, Samundeeswarar st, Abdulkalam road, Sripuram, Thiruneermalai main road, Kannaiyaram st, Kumarasamy aasari st and surrounding areas.