Chennai Power Shutdown on 16-10-2020

Power supply will be suspended in the following areas on 16.10.2020 from 09.00 am to 02.00 pm for maintenance work.

Supply will be resumed before 02.00 P.M if the works are completed.

GUINDY AREA: Industrial Estate Guindy, Ambal Nagar, Pillaiyar koil 3,4 & 5 st, A B C & D Block, Poomagal st, South phase, Mount road parcial, J.N salai, Pallavan st, Kabilar st, VOC st, Bharthiyar  st, Dhanakoti roja st, Ganapathy colony, Labour colony, Guindy Industrial estate, T.S mini T.S, Balaji nagar, Nagereddy thottam, Ekattuthangal part, Gandhi nagar main road, Sardar colony, Part of Poonamale salai, Palaykaran st, Arulayampettai, Part of south phase, Part of muthuraman st, North phase.