Chennai Power Shutdown on 09-11-2019

Power supply will be suspended in the following areas on 09.11.2019 from 09.00 am to 04.00 pm for maintenance work.

Supply will be resumed before 04.00 P.M if the works are completed.

THIRUMUDIVAKKAM AREA : Sidco Industrial Estate, Sidco, Kalaingar st, Mangalapuram, Royal Castle appartment, Thirumudivakkam main road, Kundrathur bazzar, Part of Murugan koil , Nadaipathai part, Melandai  st, Thirumudivakkam, Pazhanthandalam, Erumaiyur village, Kalaimagal nagar, Karpagam nagar, Rajiv Gandhi nagar, Sriukalathur, Nandhambakkam, Kalathipettai, Periyar nagar, Anjugam nagar, Somangalam, Naduveerapattu, Shakthi nagar, poonthandalam, Puthuperu, D.C Nagar, Melathur nagar, Sidco, Vazhuthalampedu part, Thiruneer malai main road, Palm Rivera Appartments, Navins Appartments, Heritage, Perumal nagar, Sambandham nagar, Siva Vishnu nagar, Natham, Arunachaleshwar nagar, Padmavathy nagar, Devagi nagar, Devi nagar, Ishwara nagar, Vazhuthalampedu, Manikandan nagar, Amarprakash Appartment.