Chennai Power Shutdown on 04-07-2019

Power supply will be suspended in the following areas on 04.07.2019 from 09.00 am to 04.00 pm for maintenance work.

Supply will be resumed before 04.00 P.M if the works are completed.

KADAPERI AREA : Zamin Royapettai, Pillaiyur koil street, Senthil Nagar, Iswariya Nagar, Arul Murugan Ramamoorthy Nagar, Vembuliamman Nagar, Suriya Avenue, Nemichery Main Road, Dhanalakshimi st, Muthusamy Nagar, Mettu street, Sivan Koil street, Bramin st, Balasubramaniam st., Nanmangalam Main road, A.G.S Colony, Postal Nagar, Nemilichery Areas.