Chennai Power Shutdown on 04-02-2021

Power supply will be suspended in the following areas on 25.01.2021 from 09.00 am to 02.00 pm for maintenance work.

Supply will be resumed before 02.00 P.M if the works are completed.

THARAMANI AREA: South Lock st, West canal road, Angalammankoil st, Guruvappan st, Pondy st, Varathapuram, Naidu st, Thulukkantha amman st, Karunanidhi I & II st, New st & Ponniyamman koil st.

THIRUVOTTIYUR AREA : T.H Road, S. koil 1st to 3rd  street, Periyar nagar, Nethaji nagar, North mada st, Thiru nagar 1,2 st, K.V kuppam, E.H Road, Anjugam nagar, Sakthi puram, Rajiv Gandhi nagar, TNSC Board II, CMRL, Gandhi nagar, Chinna Eranavoor, Wimco nagar, Thriuvottiyur area.