Chennai Power Shutdown on 02-09-2021

Power supply will be suspended in the following areas on 02.09.2021 from 09.00 am to 02.00 pm for maintenance work.

Supply will be resumed before 02.00 P.M if the works are completed.

TAMBARAM AREA:  SITHALAPAKKAM Venkatesan st, Padmavathy nagar, Anna salai, Jeyachandran nagar, Pillayar kovil st, Ramdass st POONI BAZAR Victoria garden IAF road, Velachery main road, Anthony st, Kalpana nagar MADAMBAKKAM Ramana nagar, Madambakkam main road, Anna nagar, Padmawathy nagar north, IAF Road KADAPPERI Chandran nagar main road, CLC works road, PUTHUTHANGAL Devaraj pillai st, VGN, Kurinji nagar, Abirami nagar, Perumal kovil st, Tamil Poonga st and above surrounding areas .

ADYAR AREA: VGP part-I Uthandi, Uthandi village, Gugu beach, Rajan Garden, ECR main road and surrounding areas.

PONNERI DURAINALLUR AREA: Kavarapettai, Panpakkam, Arani, Durainallur, Medur, Mangalam and above surrounding areas.

IT CORRIDOR AREA: TARAMANI Part of OM Road, Church main road, Kurinji nagar, Apollo Hospitals PERUNGUDI Suburayan nagar, Jain collegeMangalambigai nagar, Balamurgan garden, Sakthi nagar and surrounding areas.

Share this:

Exit mobile version