Chennai Power Cut Today 08-03-2023
Power supply will be suspended in AMBATTUR, VYSARPADI areas as mentioned below the following area on 08.03.2023 from 09.00 am to 02.00 pm for maintenance work.
Supply will be resumed before 02.00 P.M, if the works are completed.
AMBATTUR AREA: NNS, HIG, MIG, Chinna Nolambur, Ponniamman nagar, Mugappair west block, Mohanram nagar, Reddy palayam area, Vanagaram road, Sankar sealing road, Vallalar street, Nalapalli salai, School road, Santhosam salai and above all surrounding areas.
VYSARPADI AREA: SEMBIUM KKR Nagar, Sathiyaraj nagar, Rayal Avenue, Ambedkar nagar, Thiruvalluvar street, Burma colony and above all surrounding areas
Power supply will be suspended in AMBATTUR area as mentioned below the following area on 08.03.2023 from 09.00 am to 05.00 pm for maintenance work.
Supply will be resumed before 05.00 P.M, if the works are completed.
AMBATTUR AREA: NNS, HIG, MIG, Chinna Nolambur, Ponniamman nagar, Mugappair west block, Mohanram nagar, Reddy palayam area, and above all surrounding areas.