Chennai power cut areas today on 10-07-2024

Power supply will be suspended in Avadi, Thirumullaivoyal, Velachery, Porur, Ponneri, Adyar, Maduravoyal areas as mentioned below the following areas on 10.07.2024 from 09.00 am to 02.00 pm for maintenance work. Supply will be resumed before 02.00 P.M, if the works are completed. 

Avadi:  Thirumullaivoyal, Mittanamalli, Bharathi nagar, Muruagan koil, Morai, Madha koil, Anna nagar, Veerapuram, Thirumalai nagar. 

Velachery:  Tansi Nagar, Velachery main road part, LIC Colony, Tansi Nagar 1st to 7th street, Taramani link road part, Dhandeeswaram 11th & 12th street. 

Porur:   Lakshmi Nagar, New colony, Pillaiyar koil street, Murthy Avenue, Trunk Road, Lakshmi Nagar 40 feet road,  Lakshmi nagar Anna Salai, Paraniputhur, Thelliyaragaram, Maduram nagar, Part of Dhanalakshmi nagar, Periya Koluthvancherry, Part of Paraniputhur Village, Thirumudivakkam, Temple wave, Thiruneermalai main road, Thiru Uraga Perumal Kovil nagar, Police Quarters, Saranya nagar, A.R.Weight bridge, Sharma nagar.

Ponneri:  Vellodai, NGO Nagar, Chinnakavanam, Periyakavanam, Lakshmipuram, Balaji nagar, T.V.Padi, Parikkapattu, Uppalam, Guduvancherry Thadaperumbakkam, Anuppambattu, Aladu, A.R.Palayam, Vembakkam Anuppambattu, Akkarambedu, Devadhanam, Thottakadu Perumbedu, T.V.Puram and Kodur.

Adyar:  Kottivakkam, Thiruvanmiyur, 3rd Main road, 4th main road kamaraj nagar, PTC Depot, Thiruvalluvar salai, 5th East street to 24th East Street Kamaraj nagar, South Avenue, Mangaleri.

Maduravoyal :  Agrolla, P.H.Road, Pillayar koil street, Varalakshmi nagar, Abirami nagar, Mount Bricks, Vivekananda street, Samyapuram main road, Sai nagar, Om sakthi nagar, Porur Garden Phase       I & II, Heritage Venkateswara nagar, Mettukuppam main road, Anna street, Dharmaraja koil street, Kamadenu nagar, Ezhipidari Amman koil street, Shekmanyam, Andal nagar, Metro Nagar, Perumal koils street.

Share this:

Exit mobile version